Skip to content

B2B AI Automation & Agent Development · GCC · EU · US

Deterministic AI Agents for Enterprise Systems of Record.

We engineer autonomous AI agents that safely read, reason, and execute inside your ERP, CRM, and databases — with fail-closed cryptographic gates, zero hallucination risk, and complete audit durability.

90 minutes
— with the engineer who would run it
No deck
— bring your schema and your close process
You keep the assessment
— written up, either way
Tool failure rate
0.00%
Ledger discrepancy
$0.00
Security gate
Fail-Closed
Pilot cutover
4 Weeks

Start here

Which of these is you?

Three situations we are called into. Pick yours and the next page starts from it, so you do not explain it twice.

Selected work

Three engagements, published in full

Architecture, the constraint that forced it, and the outcome — each on its own page, each figure stated there.

SaveInGold

Bullion trading · UAE

Bullion trading platform and mobile architecture, engineered for settlement accuracy under live market pricing.

“Asim transformed a fragmented app into a seamless investment experience. Precise, intuitive, and effective.”
Amro Jabar — COO, SaveInGold
Read the full case study →
Physical gold trades processed
$50M+
Onboarding drop-off
−40%

SocialPro

Social procurement · Global

Enterprise social procurement reporting platform consolidating labour-hour and local-content compliance across a global supplier base.

Read the full case study →
Global enterprises reporting
100+
Compliance workflow time
−30%

Faroo

Service marketplace · UAE

On-demand service booking marketplace with a real-time scheduling engine and cross-platform mobile clients.

“The technical precision DataDaur brought to Faroo transformed our daily operations from reactive to proactive.”
Operations Director, Faroo
Read the full case study →
Booking conversion
+35%

Delivery method

The gate does not open until variance reads zero

Every migration we run follows the same four phases. Phase three is where most go-lives quietly accept a rounding difference. We do not.

  1. 01

    Initial seed

    Relational master-data dependency mapping — chart of accounts, posting groups, item masters — extracted and loaded into a parallel environment.

  2. 02

    Differential delta

    Nightly delta syncs with automated error logging. Every failed record is surfaced and resolved before it can reach the cutover window.

  3. 03

    Dual-write reconciliation

    Three-way reconciliation across legacy subledger, staging and target. Every account ties to the cent or the cutover stops and goes back to phase two. There is no threshold below which a difference is acceptable.

  4. 04

    Frozen-weekend cutover

    Cutover executed inside a frozen weekend with documented rollback safeguards and 24/7 hypercare through first close.

What we do

Three horizons, one engineering problem

Every system we build is one where being wrong has consequences you cannot take back.

Systems of record

This is the practice that funds the rest and sets the standard for it. A rounding error in a web app is a bug report. The same error in a posted journal is an audit finding, and it stays on the record permanently — which is why nothing here ships on a best effort.

A posted journal entry, an executed tool call and an actuator command are the same class of irreversible actionpolicy before · evidence after · a human on anything irreversibleJournal entrypostedTool callexecutedActuatormoved

The commitment

What you are actually buying

Capability is the easy part to claim. These are the parts that cost us something.

Tayyab MughalFounder · Chief AI Engineer

Engineers the Rust, the Python, and the AL/X++. Every blueprint on this site is his.

Runs the architecture review, writes the cutover plan, and is on the call at 3am on go-live weekend. Author of all 33 published blueprints.

There is no account layer here. The person who scopes the work is the person who writes it.

If it goes wrong

The gate is the safeguard

Cutover does not proceed on a variance. That is not a service level we negotiate at the end — it is a condition of the plan, agreed before work starts.

Every cutover has a rollback

Documented, rehearsed, and owned by a named person. The frozen weekend exists so that if something is wrong, Monday morning still opens on the system you had on Friday.

Hypercare through first close

We do not hand over at go-live. We hand over after your first month-end closes clean, because that is the first time anyone knows.

The assessment is yours regardless

You keep the written architecture review whether you engage us or not. If it tells you to stay where you are, that is a legitimate outcome.

Where we say no

  • A go-live date we do not believe. We will tell you what we think the date is, and if you need the original one, you need a different firm.
  • Finance & Operations when Business Central fits. The platform-fit tool on this site will say so in public, before a call.
  • An agent with write access to a ledger and no human gate on anything irreversible. There is no version of that we will build.
  • Scale we do not have. If you need forty consultants on site on Monday, we are the wrong firm and we will say so in the first conversation, not the third.

Governance

Built for regulated procurement

We deliver into EU and GCC jurisdictions where data residency and AI documentation are gating requirements, not preferences. As the work moves toward autonomy, ISO 42001 and the EU AI Act stop being paperwork and start being the design constraint.

  • GDPRCompliantEU data protection
  • EU AI ActCompliantRisk classification & documentation

Control documentation and data-processing agreements are available under NDA on request.

Commercial engagements

Fixed-scope pricing with binary acceptance gates

We do not bill open-ended hourly fees or percentage of ad spend. Every engagement is gated on mathematical verification: $0.00 ledger variance and zero unhandled exceptions.

Stage 01: Architecture DiagnosticDiagnostic Sprint
$3,500 – $4,50010 business days

Mid-market companies validating feasibility, API schemas, and security boundaries before capital allocation.

  • API schema and rate-limit audit (Dynamics, Odoo, Salesforce, SQL)
  • Manual bottleneck quantification and annual labor cost analysis
  • Threat modeling, privilege boundaries, and prompt-injection testing
  • Functional proof-of-concept prototype demonstrating core logic
Acceptance gate: Working prototype executed in sandbox with documented schema report.
Book 10-Day Diagnostic
Stage 02: Production PilotMilestone-Gated Build
$18,500 – $48,0004 to 6 weeks

Companies deploying a business-critical workflow into live production with deterministic safety gates.

  • Full production daemon/agent deployment in client VPC
  • Bi-directional ERP/CRM sync or automated AP 3-way matching
  • Issa Action Gateway integration with fail-closed security plane
  • Human-in-the-loop exception dashboard (Teams, Slack, or Web)
Acceptance gate: $0.00 ledger posting variance across 500+ historical test transactions.
Scope Production Pilot
Stage 03: Continuous GovernanceMonthly Retainer
$3,500 – $12,500 / moMonthly recurring

Enterprises requiring 24/7 runtime monitoring, schema drift updates, model evals, or ongoing ABM pipeline.

  • 24/7 dead-letter queue monitoring and automated exception alerts
  • Schema drift maintenance when ERP fields or CRM objects change
  • Continuous prompt regression testing and LLM evaluation suites
  • Dedicated Slack/Teams channel with 1-hour critical response SLA
Acceptance gate: Monthly SLA uptime report with 99.9% gate availability.
Explore Retainer Terms
✓ 100% Diagnostic Credit

If you proceed to a production implementation within 30 days of receiving your 10-day Architecture Diagnostic, the full fee ($3,500 – $4,500) is deducted from the build contract.

✓ Deterministic Acceptance Gate

Final milestone payments are gated on binary verification: $0.00 ledger reconciliation variance and 100% fail-closed schema conformance in staging before cutover.

✓ Full Code & VPC Ownership

All custom agent code, Rust gateway binaries, and automation runbooks deploy into your cloud environment (AWS, Azure, GCP, or on-premise) with complete source code handoff.

✓ Zero Spend-Markup Policy

We charge flat monthly retainers rather than a percentage of ad spend or token usage. We have zero financial incentive to inflate your media budgets or compute consumption.

All rates reflect fixed-scope milestone delivery. Cloud compute, model API tokens, and third-party software licenses pass through directly at cost without markup. 100% of Architecture Diagnostic fees are credited toward Phase 2 production builds.

Questions

What procurement asks first

The four that decide whether a conversation goes further.

What does DataDaur do?

DataDaur is an engineering firm running two practices: Microsoft Dynamics 365 and Official Odoo 19 ERP implementation, and agent infrastructure built on top of those systems. Delivery spans the United States, the UAE and the European Union.

What is the $0.00 variance gate?

Before any cutover proceeds, we run a three-way reconciliation across the legacy subledger, the staging environment and the target system. The cutover gate does not open until subledger variance reads $0.00.

How long does an ERP implementation take?

Odoo and Dynamics 365 Business Central deployments typically run 4 to 12 weeks. Dynamics 365 Finance & Operations migrations and multi-entity builds typically run 12 to 24 weeks.

Which compliance regimes does DataDaur work under?

We deliver under GDPR and EU AI Act documentation requirements. SOC 2 Type II, ISO 27001 and ISO 42001 are not held and are not claimed. Control documentation and data-processing agreements are available under NDA on request.

Start

Bring us your most expensive operational bottleneck.

Whether it is a manual AP reconciliation backlog, an autonomous agent that cannot safely execute database writes, or marketing spend with zero ledger attribution. We inspect the schema and scope the fix out loud.

  1. 01You describe the constraint. Schema, close process, the date you are held to.
  2. 02We say what we think is actually wrong, including when it is not the software.
  3. 03We scope it out loud — phases, gates, what we would refuse to compress.
  4. 04You get the assessment in writing within two business days.
Tayyab MughalEngineers the Rust, the Python, and the AL/X++. Every blueprint on this site is his.

Hours
Monday to Friday · 10:00 – 22:00 PKT (UTC+5)
Delivery
GCC · European Union · United States

Mutual NDA before any schema or financial data is shared. We sign yours; we do not require ours.